Feature Project
|
Edmonton Convention Centre - Hall A,B & C
The Edmonton Convention Centre was an 8 week project where the entire floor in halls A, B & C were replaced. The total floor area of the three halls is 72,000 sft. All the existing ceramic had to be removed (by others), this left a rough surface that we were required to grind, self-level to make ready for the new carpet tile installation. A total of 3,600 bags of self-levelling was used and 72,000 sft of new carpet tile installed. Project was completed and turned back over to the owner on time.
Our Services Featured
|